Recent Tables of Contents – June 2016

July 20, 2016

Working on Our Curb Appeal

July 6, 2016

Although we moved back into the library in February, we have still been very much in a construction zone since then with work on the building exterior and interior ongoing.  But it looks like there is a light at the end of the tunnel. The construction hoardings have been taken down and work on the building’s landscaping is moving apace.

A view of the entry courtyard with the Jackman building on the left and the library pavillion on the right. Straight ahead you can see Wycliffe College on Hoskins Avenue.

A view of the entry courtyard with the Jackman building on the left and the library pavilion on the right. Straight ahead you can see Wycliffe College on Hoskins Avenue.

The exterior of the Jackman building from Queen's Park. The ground cover will eventual grow in, greening and softening the landscape.

The exterior of the Jackman building from Queen’s Park. The ground cover will eventual grow in, greening and softening the landscape.

The library, viewed from Philosopher's Walk looking south

The library, viewed from Philosopher’s Walk looking south

The library, viewed from the Bennett Gate looking north.

The library, viewed from the Bennett Gate looking north.

What a contrast from this!

What a contrast from this!